Home

Wednesday 25 April 2012

SPPID_EDE view setting for LDT

At least there're 3 items should be lifted out.
1. do not report.
2. connectors zero length.
3. supply by.


SPPID_How to move one component to another one

Sometimes, we need move one component connect to another one; in another word, reduce the line between these two component into "zero".
The correct way is:
1. make sure everything is on grid.
2. click one component, then click move.
3. when the arrow point is close to another component, the line will shows red, then you can see clearly the connect point. just release your left mouse key, it will automatically connect to the point.
4. check the property, the "connector zero length" will show "True".

SPPID_How to define the line between Control valve and Reducer

There are two lines between control valve and reducer.
In the real construction work, these two lines are not exist. but on P&ID drawings, it need shows.
The problem is: if we define it " do not report false", these lines will showing on LDT; it we define it "do not report true", it will affect LDT from and to. I found the easy way is define the "do not report" blank. when we generate LDT, we only pick up "do not report false".

Tuesday 3 April 2012

SPPID_LDT crushed in the middle of work

Sometimes the LDT report crushed in the middle of work.
when we redo another one by same name. It shows us: "that excel sheet is still running. you can not replace it."
We need go to Task Manager. Find "EXCEL.EXE", then click "End Process".

You will be ok to redo another report.